We’ve developed our draft Urban Water Strategy 2022, which forms part of a suite of plans locally and across the state to help secure our water future.

The strategy covers anticipated needs and requirements for the next 50 years, to ensure we have the right mix of actions in place to support the development of resilient and liveable communities now and into the future.

It assesses our water supplies and wastewater management for each of our 13 supply systems across our region, and identifies future water use requirements based on population growth, climate change and other variable factors.

The draft strategy will be available for a two-week period for people to read and have their say. Customer feedback has already formed a significant part of our strategy development, but we want to ensure the final draft accurately reflects the needs and desires of our customers.

You can read the full draft document, or summaries we’ve prepared for each section:
Urban Water Strategy 2022 - PDF, (5.7MB)
Executive Summary - PDF, (872Kb)
Goulburn System Summary - PDF, (540Kb)
Murray System Summary - PDF, (518Kb)
Sunday Creek System (Broadford-Kilmore) Summary - PDF, (325Kb)
Delatite River System (Mansfield) Summary - PDF, (323Kb)
Seven Creeks System (Euroa and Violet Town) Summary - PDF, (302Kb)
Steavenson River System (Marysville and Buxton) Summary - PDF, (318Kb)
Nine Mile Creek System (Longwood) Summary - PDF, (282Kb)
Mollison Creek System (Pyalong) Summary - PDF, (362Kb)
Yea River System (Mansfield) Summary - PDF, (337Kb)
Upper Delatite System (Merrijig and Sawmill Settlement) Summary - PDF, (288Kb)
Seven Creeks System (Strathbogie) Summary - PDF, (286Kb)
Brewery Creek System (Woods Point) Summary - PDF, (251Kb)
Katunga System (Groundwater) Summary - PDF, (266Kb)
Wastewater Systems Summary - PDF, (347Kb)

Share your thoughts in our survey! Click here to start, consultation is open from 9am Wednesday 23 February and closes 11.59pm Tuesday 8 March.

Once we've finalised the strategy, we'll submit it to Minister for Water Lisa Neville before March 31.