This page contains information, documents, drawings and forms to assist with the design and construction of sewage pump stations and rising mains.

For details about requirements that are not listed below, contact (e) mail@gvwater.vic.gov.au or (p) 1800 454 500.

Documents

Sewage Pump Station Design Manual (PDF, 523kb)

Sewage Pump Station - Specific Electrical Requirements

Standard Drawings

STD/6 - Sewage Pump Station - General Arrangements - under review, please contact GVW for more information

STD/7 - Sewage Pump Station - Structural Details

STD/21 - Standard Drawings Typical Pump Station Layout - under review, please contact GVW for more information

Sewage Pump Station - Specific Electrical Requirement Drawings

Standard Drawing: Sewer Rising Main Non-Return Pit - under review, please contact GVW

Standard Drawing: Sewer Rising Main PVC detail of turn up at Point of Discharge - under review, please contact GVW

Standard Drawing: Sewer Rising Main PE detail of turn up at Point of Discharge - under review, please contact GVW

Standard Details

Standard Details: Sewer Rising Main Air Valve Assembly

Standard Details: Sewer Rising Main Scour Valve Assembly

This page was last updated on xxxxx.