This page contains information, documents, drawings and forms to assist with the design and construction of sewage pump stations and rising mains.

For details about requirements that are not listed below, contact (e) mail@gvwater.vic.gov.au or (p) 1800 454 500.

Documents

Sewage Pump Station Design Manual (PDF, 523kb)

Sewage Pump Station - Specific Electrical Requirements

Standard Drawings
(For CAD copy of the drawings, please contact relevant PM directly)

Single Pump DOL Pump Station Switchboard

Single Pump Soft Starter Pump Station Switchboard

Two Pumps DOL Pump Station Switchboard

Two Pumps Soft Starter Pump Station Switchboard

Two Pumps VSD Pump Station Switchboard

STD/6 - Sewage Pump Station - General Arrangements - under review, please contact GVW for more information

STD/7 - Sewage Pump Station - Structural Details

STD/21 - Standard Drawings Typical Pump Station Layout - under review, please contact GVW for more information

Standard Drawing: Sewer Rising Main Non-Return Pit - under review, please contact GVW

Standard Drawing: Sewer Rising Main PVC detail of turn up at Point of Discharge (PDF, 111kb)

Standard Drawing: Sewer Rising Main PE detail of turn up at Point of Discharge (PDF, 102kb)

Standard Details

Standard Details: Sewer Rising Main Air Valve Assembly

Standard Details: Sewer Rising Main Scour Valve Assembly

Forms

Form: Sewage Pump Station or Rising Main Shutdown (PDF, 104kb)

This page was last updated on 12 December 2024.